Product Detail :
|
Formation of Industrial layout including formation of 60m wide road, 30m wide road, 24m wide road of flexible pavement, including asphalting, construction of RCC side drain, RCC box culvert, RCC utility duct, RCC retaining wall, HDPE dual water supply pipeline, UGD pipeline network, Construction of ICCC building etc at sector 1, Construction of RCC duct, Formation of industrial layout including formation of plot including road.
|