Product Detail :
|
Construction of earth fill farm ponds at patherwala farm 1percentage basis gravity flow pipeline -
providing, laying. lowering & jointing hdpe pipes including excavation, backfilling, fixing valves, road crossing and all other necessary works, with giving hydraulic test etc complete.at manjari site 1providing & erecting chain link fencing with 0.45 mm dia. razor wire on top for patherwala farm 1installation of drip irrigation system for sugarcane ( area= 35 acres) at patherwala farm tal .ambed.
|