Product Detail :
|
Provision for erection and fabrication of 9.00mtr steek staging with 10kl hdpe tank , construction of 40kl sumpwell , drilling of 90.00mtr depth 150mm dia. gravel packed tw with gi casing pipe, providing, laying, jointing, interconnection, testing and commissioning of 90 mm dia. upvc 10kg/6kg pressure , 63 mm dia to 75 mm hdpe pe-100 , pn-6 pipe and 50mm dia. of medium class gi pipe (total length of rising main and distribution pipeline – 4000.00 mtr.)with suitable joints,& valve specials and all fittings including all allied civil works, supplying & installation of energy efficiant five star bee rating isi marked required capacity three phase, 50 hz, 220v, deep well submersible pump stainless steel body, suitable for 4"/6" tube well with contral panel starter suitable for submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications butexcludingpipe,ss/nylonwireropeandconnection cable including verification of tubewell yield&3phase electric connection from cseb, construction of brick masonry switch room of size 3.00*2.50*3.00mtr , installation of 01 no. electro chlorinator , construction of chlorinator room of size 3.00*4.00*3.50 mtr , providing functional household tap connection(f.h.t.c) in 148 individual households and government instiution, renovation of existing oht,boundary wall and pipe etc. completewith trial run operation & maintanance for 06 months under retrofitting of piped water supply scheme under jal jeevan mission for habitation ghaghra village - ghaghra , block - manora, district – jashpur.
|