| Sector | abcRailways Transport Services | Tender Value | N.A. | Location | Tamil Nadu - India | Ref.No | 51966317 | Closing Date | 15 - Sep - 2022 | | | Supply of bogie frame bogie frame arrangement for 1600 hp ac-ac dmu/dpc coaches to drg.no.(531)dmu/dpc/ss-0-3-001 col.1 alt 'k'. bogie frame to be supplied without nylon busheswherever applicable and rdso/specn. c-9202, rev-02. the firm shall fulfil therequirement as per icf/md/specn.147 issue status-01, rev-02 with amendment no.1.safety item special condition i) paint scheme shall be as per drawing. ii) qap to formaticf/ims/md/f-31 shall be prepared along with relevant documents and kept readyfor developmental/educational order. iii)firm should supply bogie frame alongwith the dimensional report, stress relieving report and radiography films. iv) firmshould have induction/electric furnace for stress relieving of bogie frame. v)prototype inspection is applicable only for first time ofdevelopmental/educational order.bogie frame to drg. no. (a) icf/mrvc/d-0-3-001, alt "m", col-ii (or) (b)icf/mrvc/d/bt-0-3-001, alt "c", col -ii ---- along with damper fixing bracket to drg. no.ac/dc/emu/d6-0-1-602,col.i - 4 nos and bolt complete to drg. no. emu/m/3ph-0-2-002, alt "b",col.i - 16 sets bogie frame to be supplied without nylon bushes where everapplicable and shall confirm to rdso/specn.c-9202, rev-2. the firm shall fulfil therequirement as per icf/md/specn/147, issue status 01, rev-02 with amendment no. - 01.safety item special condition suppliers commitment will be there to supply as perdrawing -(a) ( for dash pot arrangement ) or as per new drawing - (b) ( for adoptionof conical spring ).- one month notice will be given to vendor whether he has tosupply as per drawing - (a) or drawing - (b). rate quoted will be applicable to bothdrawing - (a) and drawing - (b) . i) paint scheme shall be as per drawing. ii) qap toformat icf/ims/md/f-31 shall be prepared along with relevant documents and keptready for developmental/educational order. iii)firm should supply bogie framealong with the dimensional report, stress relieving report and radiography films.iv) firm should have induction/electric furnace for stress relieving of bogie |
|
|
If you are a new user, then please
register, it's Free and then fill the form below.
If you are registered with us, just fill the form below, we will get back to you
shortly.
|
All fileds marked with '*' are compulsary.
|
|
|