Inquiry For Liaison Service
Sector abcScientific InstrumentsTender ValueINR 1 Crore
LocationRajasthan - India Ref.No85651408
Closing Date18 - Jul - 2025
Supply of Various Material at Gram Panchayat Reeth, Panchayat Samiti Kotri 2025-26 (yearly Rate Contract) - clay Work, 15 Cm Cutting the Average Soil of the Land, Surface Dressing and Vegetation and, Removal of Small Plants and Insignificant Matter and Garbage, Lifting the Karkat to 1.5 M and Up to 50 M Distance, Pour In., in Ordinary/sand/soft Soil, Narrow Soil /smooth Soil / Pebble Soil, Soil Up to 1.5 Depth in Foundation, Ditch, Parnala, Digging, Crushing the Bottom, Watering, Armpits, Grooming, Digging Out the Dug Clay, Foundation, After Filling, Fill the Empty Spaces Again with Soil, and Keep the Remaining Soil Up to a Distance of 50 Meters., Salvage, in Simple/soft Soil, in Hard, Smooth, Pebble Soil, Decomposed Rock, Ordinary Rock, Item 2 Has 1.5 M Extra Lift, Up to 50 Meters Extra Distance (lead) in Item 2, to Throw Away, Dig the Soil/sand in the Foundation and in the Chair 50, Lead and Levelling Up to Meters, • Pour Water and Crush It with a Distance., Stainbelling, 2.5 Cm. From 5.0 Cm. Deep, 5 Cm. From 7.5 Cm. Deep, 7.5 Cm. From 10 Cm. Deep, 10 Cm. From 15 Cm. Deep, Clay By J.c.b. Machine/tractor Maya Scraper, Excavation Work, Breaking the Dug Up Clay Dug, Breaking of Clods), Separation of Grass and Pebbles, Stone, ???? (sorting of Grass & Pebbles) ??? ???? (bund), Section of (in Cut Area)/profile Maintained, Loading and Unloading Initial Lead 250 M., ??? ????? 3 ??. ??? Draft Based on Chapter 5th of, Irrigation Page Number 32 to 34 (?????? 01/02/2017, Valid From 1) Unit 1 M3., Machinery Work in Soft Soil, Machinery Work in Hard Soil, Concrete Function, the Foundation Consists of 20 Mm of Pitcher Or Conker Or Jhajhara., Laying and Water of Nominal Measuring Materials, Pour It and Crush It with a Far-mouthed., the Foundation Should Be Made of Lime Concrete 40 Mm. Napeal Measurements, Mixing with Ballast, Crushing with a Doormat and, Including Lowlanding, Etc., Stone Ballast (crusher Broken) 1 Cubic Meter Quantity, in 83 Kg of Lime and 0.48 Cubic M. Sand Spices, with ., 40mm Crusher of Broken Stone, Hand Broken Roadies in Place of Ballast, the Same Quantity Will Be Payable When Used But Ballast., the Rate Will Be Cut By 30 Percent., Stone Ballast (crusher Broken) 1 Cubic Meter Quantity, in 83 Kg of Lime and 0.48 Cubic M. Rakhi Spices, with ., 40mm Crusher of Broken Stone, the Same Quantity Will Be Payable When Used But Ballast., Hand Broken Rod in Place of Ballast, the Rate Will Be Cut By 30 Percent., Brick Ballast 1 Cubic Meter in Volume 83 Kg Lime, and 0.48 M3. Sand with Spice, Brick Ballast 1 Cubic Meter in Volume 83 Kg Lime, and 0.48 M3. Rakhi with Spices, Measurement of Stone Ballast (crusher Broken) / Brick Ballast, Cement Concrete Foundation Or Floor Should Be 40 Mm Deep. Nominal, Cement-sand Masala , 1 Cement 5 Sand 10 Soil, Mixing in Proportion and Crushing, Lowland, with Stone Ballast (crusher Broken), Even., Mm Crusher in Place of Broken Stone Ballast, 40, Same Quantity When Used with a Broken Rod By Hand, the Rate of Ballast Will Be Payable By 30 Per Cent., There Will Be a Cut., with Brick Ballast, Meat Concrete Boat Or Fash with 40 Mm Weight Namaya, Cement-sand Seasoning 1 Cement 4 Sand 8 Ballast, Crusher Broken/brick Soil, , Pour and Thrash in Proportion, Including Lowlands., with Stone Ballast (crusher Broken), Mm Crusher in Place of Broken Stone Ballast, 40, Same Quantity When Used with a Broken Rod By Hand, the Rate of Ballast Will Be Payable By 30 Per Cent., There Will Be a Cut., with Brick Ballast, Cement Concrete Foundation Has a Depth of 40 Mm. Nominal Measurements, Crusher Broken/brick Ballast Cement, Sand Masala 1 Cement 6 Sand 12 Ballast Ratio, Mixing, Pouring and Crushing, Including Lowlands., (as Per is Codes 7272 and 10067), 40 with Stone Ballast (crusher Broken), Same Quantity When Used with a Broken Rod By Hand, Mm Crusher in Place of Broken Stone Ballast, the Rate of Ballast Will Be Payable By 30 Per Cent., There Will Be a Cut., with Brick Ballast, the Foundation Has a 40 Mm Diameter. Nominal Measurement of Stone, Crusher Broken/with Brick Ballast 40, Mix and Crush the Soil with Percentage Mortar., 40 with Stone Ballast (crusher Broken), Mm Crusher in Place of Broken Stone Ballast, Same Quantity When Used with a Broken Rod By Hand, the Rate of Ballast Will Be Payable By 30 Per Cent., There Will Be a Cut., with Brick Ballast, Reinforced of Cement Concrete 124/11.53 Mixture, Pouring and Supplying Cement to Concrete, Roofing, Clamp in Slabs, Balconies, Beams, Lintels, Etc., and Leveling the Surface with 13 Cement Spices., ??? ???? ???????? ???? ?????? ????? ???, Shuttering Price Separately., Ratio 124, Ratio 11.53, Cut for Rcc in Foundation, Couples for Extra Floor, in Which 1 Cement 2 Gravel 4 Stone Or Brick, Cement Concrete in 50mm Thickness 124 Mixture, 12 M. Mixing with Moist Ballast, Crushing, , with Suppression and Terai Etc., Stone Ballast, Brick Ballast, Cement Concrete 1 Cement 4 Gravel and 8 Ballast/ballast. 1, Cement, 3 Gravel and 6 Ballast
If you are a new user, then please register, it's Free and then fill the form below.

If you are registered with us, just fill the form below, we will get back to you shortly.


All fileds marked with '*' are compulsary.
Email Id : *
Comments: *
 Login/Register
Members/Visitors Login to continue
 Email Id:
 Password:


 Forgot Password?
 Tenders by Industry
Skip Navigation Links.
Expand Plastic TendersPlastic Tenders
more  »
Tenders by Ownership
Central Government/Public Sector Tenders
Co-operatives Tenders
Corporations/ Associations/ Others Tenders
Education & Research Institutes Tenders
Joint Sector Tenders
Non classified Tenders
Private Sector Tenders
Research Institutes Tenders
State Government Tenders
Trust Tenders
 Tenders by State in India
Andhra Pradesh Tenders
Delhi Tenders
Gujarat Tenders
Madhya Pradesh Tenders
Maharashtra Tenders
Rajasthan Tenders
Tamil Nadu Tenders
Uttar Pradesh Tenders
West Bengal Tenders
more  »