Product Detail :
|
Providing, laying, jointing, interconnection, testing and commissioning of 63 mm dia to 75 mm hdpe pe-100 , pn-6 pipe 20200 m length with suitable joints & provision for supply and installation of hdpe tank of 2 no x 5000litre capacity & 9m gi structure staging all fitting, valve specials and all fittings including all allied civil works, Supplying & installation of energy efficiant five star bee rating isi marked required capacity three phase, 50 hz, 220v, deep well submersible pump stainless steel body, suitable for 4"/6" tube well with contral panel starter suitable for submersible pump with dry run protection, connections, including clamps, bore cap etc. as required as per specifications but excluding pipe, ss/nylon wire rope and connection cable including verification of tubewell yield & electric connection from cseb, Construction of brick masonry switch room of size 1.5*1.5*2.5 mtr, information board, Providing functional household tap connection (f.h.t.c) in individual households and government instiution etc. complete with trial run three month and operation & maintenance for 06 months under solar based piped water supply scheme under jal jeevan mission for village amandon (khaspara), baroul(khaspara), chandarpur(aamapara), karanjwar (khaspara), khajuri (khaspara), khorma (sarnapara), matidand (patelpara), bagda (khaspara/rajwaripara), devri (khaspara), kewra (kataipara), mayapur-2 (khaspara), rampur (khaspara), sarhari (nawapara), sautar (bamhanipara), govardhanpur (khaspara), matidand (khaspara), chandoura (nawapara) and pahiya (badkapara) ( total 18 villages ) block pratappur,
|